RW-26-0613RE-FLOW

Harrowby bridge - parapet repair

Client
Tier-1 Highways Partner C
Service
Bridges and structures
Manager
Osian Farrant
Status
Closed
Start
27 Apr 2026
Finish
29 Apr 2026
Order value
£9,460
No flags
SAGESYRINXJOINEDInternal plant hire in Sage equals the Syrinx charges for this job to 30 Sep 2026: difference £0.00

Money

SAGE
Invoiced to date£9,460.00
5000 Materials£1,853.95
5100 Subcontract£893.55
5200 Direct labour£1,177.00
5300 Plant hire - internal£500.00
5310 Plant hire - external£452.23
5400 Fuel£465.08
5500 Haulage and tipping£581.94
Cost to date£5,923.75
Margin37.4%£3,536.25

Kit

SYRINX
5 hires, £500 charged
MovementAssetDescriptionOn hireOff hireDaysDay rateChargeInspection in date every day out
MV-11746TL-0298Core drill rig27 Apr 202630 Apr 20264£22.00£88.00Yes
MV-11747PL-061LED lighting tower27 Apr 202630 Apr 20264£40.00£160.00Yes
MV-11748TL-0248Petrol cut-off saw 350mm27 Apr 202630 Apr 20264£19.00£76.00Yes
MV-11749LG-146Bow shackle 3.25t27 Apr 202630 Apr 20264£5.00£20.00Yes
MV-11750PL-032Generator 20kVA27 Apr 202629 Apr 20263£52.00£156.00Yes
Total (5 records)£500.00

Site: who worked on it

RE-FLOW
DatePersonRoleCards heldCards valid that dayBooking
27 Apr 2026Gwion FarrantOperativeCSCS, Working at height, Abrasive wheelsYesWorked
27 Apr 2026Jac AshdownOperativeCSCS, Working at height, Abrasive wheelsYesWorked
28 Apr 2026Ffion KetteringGang foremanCSCS, NRSWA street works, SMSTS, Confined spaces, Working at height, Abrasive wheelsYesWorked
28 Apr 2026Geraint TrevithinOperativeCSCS, Working at height, Abrasive wheelsYesWorked
29 Apr 2026Geraint TrevithinOperativeCSCS, Working at height, Abrasive wheelsYesWorked
29 Apr 2026Hywel OakhurstOperativeCSCS, First aid at work, Working at height, Abrasive wheelsYesWorked

Site: forms

RE-FLOW
18 forms, 1 unsigned
FormTypeDateJobPersonDetailSignedGPS
F-110181RAMS briefing sign-on27 Apr 2026RW-26-0613Jac AshdownYes51.7409, -2.6379
F-110182RAMS briefing sign-on27 Apr 2026RW-26-0613Gwion FarrantYes51.7396, -2.6397
F-110183Daily timesheet27 Apr 2026RW-26-0613Jac Ashdown9 hoursYes51.7415, -2.6379
F-110184Daily timesheet27 Apr 2026RW-26-0613Gwion Farrant8 hoursYes51.7410, -2.6385
F-110185Daily site diary27 Apr 2026RW-26-0613Jac AshdownNo51.7407, -2.6386
F-110186Toolbox talk27 Apr 2026RW-26-0613Jac AshdownLifting operationsYes51.7396, -2.6395
F-110187Pre-use check27 Apr 2026RW-26-0613Gwion FarrantTL-0298Yes51.7409, -2.6379
F-110188Pre-use check27 Apr 2026RW-26-0613Gwion FarrantPL-061Yes51.7409, -2.6379
F-110189Pre-use check27 Apr 2026RW-26-0613Gwion FarrantTL-0248Yes51.7409, -2.6379
F-110190Pre-use check27 Apr 2026RW-26-0613Gwion FarrantLG-146Yes51.7409, -2.6379
F-110191Pre-use check27 Apr 2026RW-26-0613Gwion FarrantPL-032Yes51.7409, -2.6379
F-110247Daily timesheet28 Apr 2026RW-26-0613Ffion Kettering9 hoursYes51.7403, -2.6389
F-110248Daily timesheet28 Apr 2026RW-26-0613Geraint Trevithin8 hoursYes51.7408, -2.6379
F-110249Daily site diary28 Apr 2026RW-26-0613Ffion KetteringYes51.7415, -2.6396
F-110322Daily timesheet29 Apr 2026RW-26-0613Hywel Oakhurst8 hoursYes51.7399, -2.6396
F-110323Daily timesheet29 Apr 2026RW-26-0613Geraint Trevithin10 hoursYes51.7401, -2.6395
F-110324Daily site diary29 Apr 2026RW-26-0613Hywel OakhurstYes51.7397, -2.6393
F-110325Job completion29 Apr 2026RW-26-0613Geraint Trevithin9 photosYes51.7410, -2.6384