RW-26-0658RE-FLOW

Kestrel Way pumping station - pipework coating

Client
Tier-1 Highways Partner C
Service
Industrial coatings
Manager
Kieran Quarrell
Status
Closed
Start
25 May 2026
Finish
27 May 2026
Order value
£1,690
No flags
SAGESYRINXJOINEDInternal plant hire in Sage equals the Syrinx charges for this job to 30 Sep 2026: difference £0.00

Money

SAGE
Invoiced to date£1,690.00
5000 Materials£38.60
5100 Subcontract£24.58
5200 Direct labour£1,233.00
5300 Plant hire - internal£692.00
5310 Plant hire - external£11.41
5400 Fuel£12.09
5500 Haulage and tipping£15.73
Cost to date£2,027.41
Margin(20.0%)(£337.41)

Kit

SYRINX
5 hires, £692 charged
MovementAssetDescriptionOn hireOff hireDaysDay rateChargeInspection in date every day out
MV-11992PL-177Tracked dumper 1t25 May 202627 May 20263£93.00£279.00Yes
MV-11993PL-180Site dumper 3t25 May 202627 May 20263£75.00£225.00Yes
MV-11994TL-0517Mobile tower 4m25 May 202628 May 20264£10.00£40.00Yes
MV-11995LG-210Round sling 2t25 May 202628 May 20264£6.00£24.00Yes
MV-11996PL-196Welder generator 300A25 May 202628 May 20264£31.00£124.00Yes
Total (5 records)£692.00

Site: who worked on it

RE-FLOW
DatePersonRoleCards heldCards valid that dayBooking
25 May 2026Deiniol BevingtonFabricator welderCSCS, First aid at work, Working at height, Abrasive wheels, Welding qualificationYesWorked
25 May 2026Bethan FarrantCoatings applicatorCSCS, Working at heightYesWorked
26 May 2026Osian VarleyCoatings applicatorCSCS, First aid at work, Working at heightYesWorked
26 May 2026Hywel ArwelDrainage and CCTV operativeCSCS, Confined spaces, Working at height, IPAFYesWorked
27 May 2026Deiniol BevingtonFabricator welderCSCS, First aid at work, Working at height, Abrasive wheels, Welding qualificationYesWorked
27 May 2026Tomos OakhurstDrainage and CCTV operativeCSCS, First aid at work, Confined spaces, Working at height, IPAFYesWorked

Site: forms

RE-FLOW
19 forms, 0 unsigned
FormTypeDateJobPersonDetailSignedGPS
F-111557RAMS briefing sign-on25 May 2026RW-26-0658Deiniol BevingtonYes51.6791, -3.0536
F-111558RAMS briefing sign-on25 May 2026RW-26-0658Bethan FarrantYes51.6797, -3.0534
F-111559Daily timesheet25 May 2026RW-26-0658Deiniol Bevington10 hoursYes51.6795, -3.0527
F-111560Daily timesheet25 May 2026RW-26-0658Bethan Farrant9 hoursYes51.6807, -3.0539
F-111561Daily site diary25 May 2026RW-26-0658Deiniol BevingtonYes51.6793, -3.0535
F-111562Toolbox talk25 May 2026RW-26-0658Deiniol BevingtonSlips and tripsYes51.6797, -3.0538
F-111563Pre-use check25 May 2026RW-26-0658Bethan FarrantPL-177Yes51.6791, -3.0536
F-111564Pre-use check25 May 2026RW-26-0658Bethan FarrantPL-180Yes51.6791, -3.0536
F-111565Pre-use check25 May 2026RW-26-0658Bethan FarrantTL-0517Yes51.6791, -3.0536
F-111566Pre-use check25 May 2026RW-26-0658Bethan FarrantLG-210Yes51.6791, -3.0536
F-111567Pre-use check25 May 2026RW-26-0658Bethan FarrantPL-196Yes51.6791, -3.0536
F-111619Daily timesheet26 May 2026RW-26-0658Osian Varley8 hoursYes51.6792, -3.0527
F-111620Daily timesheet26 May 2026RW-26-0658Hywel Arwel9 hoursYes51.6805, -3.0528
F-111621Daily site diary26 May 2026RW-26-0658Osian VarleyYes51.6804, -3.0530
F-111673Daily timesheet27 May 2026RW-26-0658Deiniol Bevington8 hoursYes51.6801, -3.0536
F-111674Daily timesheet27 May 2026RW-26-0658Tomos Oakhurst9 hoursYes51.6795, -3.0533
F-111675Daily site diary27 May 2026RW-26-0658Deiniol BevingtonYes51.6800, -3.0537
F-111676Hot works permit27 May 2026RW-26-0658Deiniol BevingtonYes51.6796, -3.0533
F-111677Job completion27 May 2026RW-26-0658Tomos Oakhurst12 photosYes51.6805, -3.0539